Bioenergy Optimization Program. Implementation incentive
“Manitoba. Manitoba Hydro”
$1,000,000.00
Maximum Eligible Amount
Government Grant
Fund Type
This incentive helps to offset project evaluation costs and the capital investment required to install a biomass-to-energy conversion system, as well as technical support.
- Incentive amounts are based on 15¢ per kWh for annual electricity reduction and 30¢ per cubic metre for annual equivalent natural gas reduction. The incentive will not exceed 50% of the eligible project costs or a maximum incentive of $1,000,000 on electrical load reductions and $250,000 on natural gas load reductions.